Lean and quick changeover, SMED

精益生产与快速换型

Illustration of Lean and quick changeover, SMED
A sketch of the idea, not an engineering drawing.

In plain words

Cutting out waste: waiting, walking, redoing. One big target is changeover time, tackled like a racing pit stop: get everything ready beforehand so the machine stops only briefly.

What it is

Lean removes waste: waiting, motion, inventory, defects. SMED cuts changeover time by moving work outside the machine stop: preset tools, standard fixtures, zero-point clamping.

Why it matters for products

Setup time is the largest cost in high-mix work, so tools that shorten it pay back fastest.

Learn first

Making a part like this? Plan the process and estimate costs in Workspace.